Research / 05

2020–2021

Power Electronics & Digital Control

Taking converter dynamics into real-time firmware and laboratory validation, illustrated by a bidirectional multilevel prototype.

  • Power conversion
  • Digital control
  • Embedded firmware
  • Experimental validation
Conceptual double-conversion UPS with rectifier, DC-link capacitor, battery, inverter and open bypass; not an experimental circuit diagram.

Overview

Power-converter control is where an electrical model becomes software that has to work with real voltage, current and stored energy. This theme brings together my experience in modeling, digital regulation, embedded firmware and experimental validation.

A concrete example is the ASTRO / ASTRO-HD work at SUPSI-ISEA. The documented prototype was a bidirectional, grid-connected flying-capacitor converter with a seven-level GaN power stage. It transferred energy between an approximately ±400 V DC link and a single-phase AC grid, operating as both an inverter and an active rectifier.

The work combines modelling, implementation and laboratory validation from 2020–2021.

My contribution

I developed simulations, converter control and embedded firmware, and participated with the team in commissioning and laboratory testing. My contribution connected electrical dynamics, switching models, current regulation, operating sequences and diagnostics.

The prototype and its measured performance were collaborative team results.

Challenge

A converter must do more than generate a useful waveform. It has to synchronize with the grid, follow a current reference, respect available voltage, manage capacitor energy and move between start-up, operation and shutdown without treating those transitions as afterthoughts.

Approach

Start from the electrical dynamics

An equivalent RL branch gives the current-control problem a clear physical basis:

Ldidt=vconverter−vgrid−Ri.L\frac{\mathrm{d}i}{\mathrm{d}t} = v_{\mathrm{converter}}-v_{\mathrm{grid}}-Ri.

Discrete-time feedback with integral action addressed current tracking. Model-based feedforward supplied the voltage associated with the requested trajectory, while voltage limiting and anti-windup handled actuator saturation. A digital phase-locked loop generated the grid-synchronized reference.

Archived current-controller model with feedforward, feedback, integral action, voltage limiting and an anti-windup path.
Current-control architecture with feedforward, feedback and anti-windup.SUPSI project archive · December 2020

Use multilevel modulation deliberately

Six phase-shifted carriers drove the seven-level leg. The control study investigated capacitor-voltage balancing and selected natural balancing for the configuration studied, together with its filter requirements. Switching models were used to examine behavior that an averaged plant model alone would not expose.

Simulated grid voltage and converter switching-node voltage, showing discrete voltage levels after the precharge transition.
Seven-level start-up simulation: grid voltage above, converter switching voltage below.Precharge study · Simulation

Embedded implementation

The firmware connected ADC acquisition to sampled control execution, PWM generation, communication and diagnostics. Its operating processes coordinated DC-link and flying-capacitor precharge, readiness, grid connection, current transfer, return to zero current and disconnection.

This is the transferable skill: translating a control design into software whose timing and state transitions remain connected to the electrical system. Commissioning then requires staged checks, instrumentation and investigation of practical effects such as relay timing, wiring and current-sensor interference.

Laboratory results

The March 2021 characterization used direct grid connection through an EMI filter, a 224 µH output inductor and a 1.5 kHz current-loop bandwidth. The following values are the reported inverter-mode measurements for the documented 2 kW nominal prototype.

Archived prototype measurements · Inverter mode · March 2021

Efficiency at nominal setpoint
97.32%

2 kW setpoint · 2043 W measured AC output

Highest of five reported points
98.26%

600 W setpoint · 30% nominal load

Reported inverter efficiency at five measured operating pointsEfficiency varies from 97.30% at the 200 W setpoint to a highest reported value of 98.26% at 600 W, then reaches 97.32% at the 2 kW nominal setpoint. Connecting lines are guides, not additional measurements.Efficiency (%)97.097.598.098.597.30%10%98.26%30%98.15%50%97.85%75%97.32%100%Nominal power setpoint
Measured inverter efficiency across five load conditions.
View all five measured operating points

DC link ±400 V · 224 µH output inductor · 1.5 kHz current loop

Inverter characterization · March 2021
SetpointAC outputReported efficiencyCurrent THDDisplacement factor
200 W209 W97.30%15.20%0.986
600 W607 W98.26%7.74%0.996
1000 W1010 W98.15%5.15%0.998
1500 W1524 W97.85%3.90%0.999
2000 W2043 W97.32%3.18%0.999

Source: team prototype characterization, revision 0.4, inverter table, p. 2. Efficiency values follow the reported power-analyzer column, not a recalculation from rounded power values. Displacement factor is not the complete true power factor.

At the nominal setpoint, grid-current THD was 3.18% and the reported displacement factor was 0.999. At the 200 W setpoint, THD rose to 15.20%: the useful engineering story is not just the best efficiency number, but how behavior changes with operating point.

Original oscilloscope capture showing a stepped multilevel voltage waveform alongside current and DC voltage channels.
Archived oscilloscope capture illustrating the discrete voltage levels during laboratory operation.Prototype team · 12 January 2021
Measurement context

The results refer to the seven-level, 2 kW prototype in inverter mode. Later five-level development and rectifier-efficiency comparisons are outside this measurement set. These are historical prototype results, rather than product-certification data.

Engineering takeaways

  • Model to implementation: connect the plant equations, controller structure and sampled firmware.
  • Energy-aware sequencing: treat initialization, precharge, limits and shutdown as part of system behavior.
  • Validation across operating points: interpret efficiency, harmonic content and phase alignment together.
  • Team-based commissioning: use simulation to guide tests, then investigate what measurements reveal about the physical system.

Project on SUPSI ARIS